Report
The outcome of a compatibility check: the classified findings plus the accepted breaks that sanction some of them. Splits findings into active (which count against the gate) and acknowledged (sanctioned), and decides whether the gate should fail for a given severity floor.
Properties
Link copied to clipboard
Link copied to clipboard
Findings sanctioned by an AcceptedBreak — logged but non-failing.
Functions
Link copied to clipboard
Whether any active finding is at or above floor (design §7 fail floor).